See what your software bill should be. Run the numbers →

Why are trade stand sales and the floor plan billed separately from gate admission?

Booth and trade stand space is rented ground, not a ticket, so it is usually a second product and a second licence. What that split costs a fair.

September 23, 2026 Written by the Hiro team

Because they are different products doing different jobs. Gate admission is a ticket sold in volume to strangers at a set price. A trade stand is a lease of ground with a contract behind it, an insurance certificate, power and water, and a price negotiated one exhibitor at a time. Ticketing platforms are built for the first and treat the second, if they handle it at all, as an add-on. So most fairs end up paying for both.

What each side is actually billed on

The two pricing models do not resemble each other, which is a large part of why the combined total is hard to see.

  • Gate admission: a fee on each advance ticket and each ride wristband, plus box office device or day hire during the week you are open.
  • Trade stands: an annual licence for the pitch map, sometimes banded on the number of pitches, plus a charge per application or per contract.
  • Anything attached to the pitch, such as power, water, vehicle passes and exhibitor badges, either as further per-item charges or on paper.
  • Card processing on both, which is the processor's charge and applies to whichever system took the money.

The floor plan is the part that is hard to rent

A pitch map is not a seating chart. Pitches are irregular, some have three metres of frontage and some have a corner, power runs only along certain lines, and a food trader cannot be put next to the livestock lines. Then add the rules a fair actually applies: a returning exhibitor keeps last year's spot, two businesses in the same trade are kept apart, and the committee holds a row back until late.

That is why the map so often ends up printed, marked in pencil and photographed. The licensed product handles the easy half and the stand secretary carries the rest in their head.

What the split costs beyond the two invoices

  • Exhibitor badges and vehicle passes are issued from the stand system while the gate is counted in the ticketing one, so nobody has a single figure for who is on the ground.
  • Insurance certificates, risk assessments and food registrations are chased by email and filed in a folder, with expiry dates nobody is watching.
  • Deposits, balances and cancellations are tracked by the treasurer on a spreadsheet sitting beside both systems.
  • Capacity is managed in two places, so a sold-out row and a full car park are discovered at different moments.
  • Next year's renewal invitations are rebuilt by hand from last year's list.

Price the week as a whole

Put the gate fees, the wristband fees, the floor plan licence, the application charges and the box office hire in one place and read them as one number. Fairs frequently find the smaller of the two invoices is the one doing the least work. Our software bill calculator is a free calculator that turns per-ticket fees and annual licences into a yearly and a three-year total you can read out in a meeting.

A single order carrying admission, ride wristbands, parking, a pen or hook-up and a trade pitch is entirely possible, because underneath all of those are inventory with a capacity you set. What does not change is the processor's charge, the carnival operator's own contract where it governs the midway, and the veterinary and registry paperwork behind livestock. Our guide to owning your software covers when building is the wrong call, and our page for fairs and expos lists what a fair board rents today.

Send us the bill. We'll send back a number.

Three questions. No call unless you want one.

No card, no call required. We reply by email.

Hiro costs about a tenth of what you pay now, quoted against your own bill. Hosting, fixes and changes included, and no per-seat fees.